The experience of the plant for activation of well drilling solution by electrical pulsed discharges

V. I. Kurets, Genadiy Petrovich Filatov, A. N. Tarakanovskij, V. G. Petnichuk

Результат исследования: Материалы для журналаСтатья

Аннотация

The description and results of operation of the plant obtained by the expeditionary firm ″Tomsk oil gas geology″ are presented. It is shown that the use of the plant under working conditions enables to save clay powder and chemical reagent and also enables to improve the quality of the shaft and in certain cases even accelerates the process of well construction. The plant is recommended for operation both in the separate boring solutions preparation points and in centralized ones.

Язык оригиналаАнглийский
Страницы (с... по...)74-76
Количество страниц3
ЖурналElektronnaya Obrabotka Materialov
Номер выпуска3
Статус публикацииОпубликовано - 1 мая 1994

    Fingerprint

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Цитировать