The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost-performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides. The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 % and higher.

Язык оригиналаАнглийский
Страницы (с-по)21-24
Число страниц4
ЖурналEurasian Mining
Том2019
Номер выпуска1
DOI
СостояниеОпубликовано - 1 янв 2019

Отпечаток

Room and pillar mining
pillar
Coal
coal
Recovery
room and pillar method
roof
Cutter loaders
Miners
Coal mines
coal production

ASJC Scopus subject areas

  • Business and International Management
  • Geotechnical Engineering and Engineering Geology
  • Economic Geology
  • Industrial and Manufacturing Engineering
  • Management of Technology and Innovation

Цитировать

Technology of extended pillar recovery in room and pillar mining in leading coal producing countries. / Prokopenko, S. A.; Sementsov, V. V.; Dobrovolsky, M. S.

В: Eurasian Mining, Том 2019, № 1, 01.01.2019, стр. 21-24.

Результат исследований: Материалы для журналаОбзорная статья

Prokopenko, S. A. ; Sementsov, V. V. ; Dobrovolsky, M. S. / Technology of extended pillar recovery in room and pillar mining in leading coal producing countries. В: Eurasian Mining. 2019 ; Том 2019, № 1. стр. 21-24.
@article{93f2ca278b29462f8ce16be9a91485c0,
title = "Technology of extended pillar recovery in room and pillar mining in leading coal producing countries",
abstract = "The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost-performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides. The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 {\%} and higher.",
keywords = "Coal, Extraction, Mine, Mining, Mobile roof support, Panel, Pillar, Reserves, Roof, Room, Technology",
author = "Prokopenko, {S. A.} and Sementsov, {V. V.} and Dobrovolsky, {M. S.}",
year = "2019",
month = "1",
day = "1",
doi = "10.17580/em.2019.01.05",
language = "English",
volume = "2019",
pages = "21--24",
journal = "Eurasian Mining",
issn = "2072-0823",
publisher = "Ore & Metals Publishing House",
number = "1",

}

TY - JOUR

T1 - Technology of extended pillar recovery in room and pillar mining in leading coal producing countries

AU - Prokopenko, S. A.

AU - Sementsov, V. V.

AU - Dobrovolsky, M. S.

PY - 2019/1/1

Y1 - 2019/1/1

N2 - The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost-performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides. The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 % and higher.

AB - The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost-performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides. The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 % and higher.

KW - Coal

KW - Extraction

KW - Mine

KW - Mining

KW - Mobile roof support

KW - Panel

KW - Pillar

KW - Reserves

KW - Roof

KW - Room

KW - Technology

UR - http://www.scopus.com/inward/record.url?scp=85069777679&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85069777679&partnerID=8YFLogxK

U2 - 10.17580/em.2019.01.05

DO - 10.17580/em.2019.01.05

M3 - Review article

AN - SCOPUS:85069777679

VL - 2019

SP - 21

EP - 24

JO - Eurasian Mining

JF - Eurasian Mining

SN - 2072-0823

IS - 1

ER -