Reliability assessment of tunneling flow charts

N. A. Antropova, V. G. Krets, V. G. Luk'Yanov, A. V. Baranova

Результат исследований: Материалы для журналарецензирование

7 Цитирования (Scopus)

Аннотация

When driving horizontal workings of different kinds it is typical to reserve excessive redundant equipment. However, the lack of resources (facilities, people) and poor management don't ensure goal achievement [3]. The paper presents reliability assessment method of tunneling with the help of mathematical modeling. The mathematical model is developed on the basis of factual data of tunneling conditions and no-failure operation probabilities of the flow chart elements are estimated. The method of reliability assessment allows identifying organizational, technological and technical elements of the reserves to increases drive efficiency and improve feasibility characteristics.

Язык оригиналаАнглийский
Номер статьи012019
ЖурналIOP Conference Series: Earth and Environmental Science
Том24
Номер выпуска1
DOI
СостояниеОпубликовано - 1 янв 2015
СобытиеScientific and Technical Challenges in the Well Drilling Progress - Tomsk, Российская Федерация
Продолжительность: 24 ноя 201427 ноя 2014

ASJC Scopus subject areas

  • Earth and Planetary Sciences(all)
  • Environmental Science(all)

Fingerprint Подробные сведения о темах исследования «Reliability assessment of tunneling flow charts». Вместе они формируют уникальный семантический отпечаток (fingerprint).

Цитировать