This paper deals with analysis of energy consumption of Ukrainian bromine plant. Process integration allows reducing the energy consumption on 1.5 MW by heat recovery. It is achieved by improvement of recuperative heat exchangers network. Additionally heat recovery may be increased by multistage evaporation of sodium bromide and ferrous chloride. Increase the heat recovery leads utility reduction. This is not only heating and cooling duty but also power pumping and pipe heat losses. The investment for retrofit project is about 757 100 ε and payback period about 2 y.

Язык оригиналаАнглийский
Страницы (с-по)1423-1428
Число страниц6
ЖурналChemical Engineering Transactions
Том39
Номер выпускаSpecial Issue
DOI
СостояниеОпубликовано - 1 янв 2014
Опубликовано для внешнего пользованияДа
Событие17th Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2014 - Prague, Чешская Республика
Продолжительность: 23 авг 201427 авг 2014

ASJC Scopus subject areas

  • Chemical Engineering(all)

Fingerprint Подробные сведения о темах исследования «Process integration for bromine plant». Вместе они формируют уникальный семантический отпечаток (fingerprint).

  • Цитировать