Abstract
The question of using a three-phase pulse generator in a nonsymmetric regime through sequential commutation of the phases is considered for an inductive load, as one possible way of raising the effectiveness of generator utilization in step operation.
Original language | English |
---|---|
Pages (from-to) | 42-48 |
Number of pages | 7 |
Journal | Soviet electrical engineering |
Volume | 50 |
Issue number | 5 |
Publication status | Published - 1979 |
ASJC Scopus subject areas
- Engineering(all)