Abstract
The article describes the results of cyclic waterflooding from 2009 to 2012 in the largest fields of the Muravlenkovskneft Branch of Gazpromneft- Noyabrskneftegas OJSC. Conclusions are drawn about the possibility of cyclic waterflooding systems for specific geological conditions. The influence of the method on the basic parameters of development was estimated.
Original language | English |
---|---|
Pages (from-to) | 65-67 |
Number of pages | 3 |
Journal | Neftyanoe khozyaystvo - Oil Industry |
Issue number | 1 |
Publication status | Published - 2013 |
Keywords
- Depletion of reserves
- Drainage
- Pressure-pulsing waterflooding
- Voidage replacement
- Water cut
- Water injection
ASJC Scopus subject areas
- Fuel Technology
- Energy Engineering and Power Technology