Abstract

When driving horizontal workings of different kinds it is typical to reserve excessive redundant equipment. However, the lack of resources (facilities, people) and poor management don't ensure goal achievement [3]. The paper presents reliability assessment method of tunneling with the help of mathematical modeling. The mathematical model is developed on the basis of factual data of tunneling conditions and no-failure operation probabilities of the flow chart elements are estimated. The method of reliability assessment allows identifying organizational, technological and technical elements of the reserves to increases drive efficiency and improve feasibility characteristics.

Original languageEnglish
Article number012019
JournalIOP Conference Series: Earth and Environmental Science
Volume24
Issue number1
DOIs
Publication statusPublished - 1 Jan 2015
EventScientific and Technical Challenges in the Well Drilling Progress - Tomsk, Russian Federation
Duration: 24 Nov 201427 Nov 2014

Fingerprint

assessment method
resource
modeling
method

ASJC Scopus subject areas

  • Earth and Planetary Sciences(all)
  • Environmental Science(all)

Cite this

Reliability assessment of tunneling flow charts. / Antropova, N. A.; Krets, V. G.; Luk'Yanov, V. G.; Baranova, A. V.

In: IOP Conference Series: Earth and Environmental Science, Vol. 24, No. 1, 012019, 01.01.2015.

Research output: Contribution to journalConference article

@article{9b4101c261a34c0db961f9c61e7bafc5,
title = "Reliability assessment of tunneling flow charts",
abstract = "When driving horizontal workings of different kinds it is typical to reserve excessive redundant equipment. However, the lack of resources (facilities, people) and poor management don't ensure goal achievement [3]. The paper presents reliability assessment method of tunneling with the help of mathematical modeling. The mathematical model is developed on the basis of factual data of tunneling conditions and no-failure operation probabilities of the flow chart elements are estimated. The method of reliability assessment allows identifying organizational, technological and technical elements of the reserves to increases drive efficiency and improve feasibility characteristics.",
author = "Antropova, {N. A.} and Krets, {V. G.} and Luk'Yanov, {V. G.} and Baranova, {A. V.}",
year = "2015",
month = "1",
day = "1",
doi = "10.1088/1755-1315/24/1/012019",
language = "English",
volume = "24",
journal = "IOP Conference Series: Earth and Environmental Science",
issn = "1755-1307",
publisher = "IOP Publishing Ltd.",
number = "1",

}

TY - JOUR

T1 - Reliability assessment of tunneling flow charts

AU - Antropova, N. A.

AU - Krets, V. G.

AU - Luk'Yanov, V. G.

AU - Baranova, A. V.

PY - 2015/1/1

Y1 - 2015/1/1

N2 - When driving horizontal workings of different kinds it is typical to reserve excessive redundant equipment. However, the lack of resources (facilities, people) and poor management don't ensure goal achievement [3]. The paper presents reliability assessment method of tunneling with the help of mathematical modeling. The mathematical model is developed on the basis of factual data of tunneling conditions and no-failure operation probabilities of the flow chart elements are estimated. The method of reliability assessment allows identifying organizational, technological and technical elements of the reserves to increases drive efficiency and improve feasibility characteristics.

AB - When driving horizontal workings of different kinds it is typical to reserve excessive redundant equipment. However, the lack of resources (facilities, people) and poor management don't ensure goal achievement [3]. The paper presents reliability assessment method of tunneling with the help of mathematical modeling. The mathematical model is developed on the basis of factual data of tunneling conditions and no-failure operation probabilities of the flow chart elements are estimated. The method of reliability assessment allows identifying organizational, technological and technical elements of the reserves to increases drive efficiency and improve feasibility characteristics.

UR - http://www.scopus.com/inward/record.url?scp=84923240860&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84923240860&partnerID=8YFLogxK

U2 - 10.1088/1755-1315/24/1/012019

DO - 10.1088/1755-1315/24/1/012019

M3 - Conference article

AN - SCOPUS:84923240860

VL - 24

JO - IOP Conference Series: Earth and Environmental Science

JF - IOP Conference Series: Earth and Environmental Science

SN - 1755-1307

IS - 1

M1 - 012019

ER -