Abstract
One of the main problems of environmental safety during construction and operation of oil wells is the preservation of tight lining and insulation permeable reservoirs along the borehole in secondary completion fluids to prevent behind-casing and cross-flow between layers flows. Slotted abrasive jet perforation is proposed to reduce the risk of negative effects on the environment during the perforation of sidetracks. Classification and analysis of the sources of environmental pollution during drilling are performed.
Original language | English |
---|---|
Pages (from-to) | 109-111 |
Number of pages | 3 |
Journal | Neftyanoe khozyaystvo - Oil Industry |
Issue number | 2 |
Publication status | Published - 2013 |
Keywords
- Completion
- Environmental safety
- Production well
- Quality cementation
- Sidetrack
ASJC Scopus subject areas
- Energy Engineering and Power Technology
- Fuel Technology