Abstract

The possibility of designing a 100-percent selective protection against ground faults of stator windings of synchronous generators, connected at generator voltage and working as a unit with a transformer, on a superimposed current with the frequency of 25 Hz, is shown. Problems of development of the reactive protection organ are set forth. Favorable results are obtained from a check of the protection carried out on a model of a large unit. The protection is applied to the large unit (containing four generators) of the Saratov hydroelectric power plant.

Translated title of the contributionOne Hundred Percent Selective Protection Against Ground Fault of Stator Windings of Synchronous Generators in a Large Power Unit.
Original languageRussian
Pages (from-to)12-16
Number of pages5
JournalIzvestiya Vysshikh Uchebnykh Zavedenij i Energeticheskikh Ob''edinenij Sng. Energetika
Issue number2
Publication statusPublished - Feb 1974

ASJC Scopus subject areas

  • Process Chemistry and Technology

Fingerprint Dive into the research topics of 'One Hundred Percent Selective Protection Against Ground Fault of Stator Windings of Synchronous Generators in a Large Power Unit.'. Together they form a unique fingerprint.

  • Cite this