Information measuring subsystem oil pumping station "parabel"

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

Information-measurement subsystem oil pumping station (OPS) "Parabel", located on the site of the main pipeline "Alexandrov-Anzhero" (OJSC "AK" Transneft "". Developed on the basis of a modern microprocessor equipment, automation, as well as high-speed digital data channels. The simple solution to meet the requirements set out in the guidance document "Automation and remote control of trunk pipelines. "General provisions" (RD-35.240.0000-KTN-207-08).

Original languageEnglish
Title of host publicationMATEC Web of Conferences
PublisherEDP Sciences
Volume19
DOIs
Publication statusPublished - 15 Dec 2014
Event2nd International Youth Forum "Smart Grids" - Tomsk, Russian Federation
Duration: 6 Oct 201410 Oct 2014

Other

Other2nd International Youth Forum "Smart Grids"
CountryRussian Federation
CityTomsk
Period6.10.1410.10.14

Fingerprint

Oils
Automation
Pipelines
Remote control
Microprocessor chips

ASJC Scopus subject areas

  • Chemistry(all)
  • Engineering(all)
  • Materials Science(all)

Cite this

Information measuring subsystem oil pumping station "parabel". / Nyashina, Galina S.; Glushkov, Dmitrii O.

MATEC Web of Conferences. Vol. 19 EDP Sciences, 2014. 01013.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Nyashina, GS & Glushkov, DO 2014, Information measuring subsystem oil pumping station "parabel". in MATEC Web of Conferences. vol. 19, 01013, EDP Sciences, 2nd International Youth Forum "Smart Grids", Tomsk, Russian Federation, 6.10.14. https://doi.org/10.1051/matecconf/20141901013
@inproceedings{adfb72203c5b4ac79d2ea9e2d90409de,
title = "Information measuring subsystem oil pumping station {"}parabel{"}",
abstract = "Information-measurement subsystem oil pumping station (OPS) {"}Parabel{"}, located on the site of the main pipeline {"}Alexandrov-Anzhero{"} (OJSC {"}AK{"} Transneft {"}{"}. Developed on the basis of a modern microprocessor equipment, automation, as well as high-speed digital data channels. The simple solution to meet the requirements set out in the guidance document {"}Automation and remote control of trunk pipelines. {"}General provisions{"} (RD-35.240.0000-KTN-207-08).",
author = "Nyashina, {Galina S.} and Glushkov, {Dmitrii O.}",
year = "2014",
month = "12",
day = "15",
doi = "10.1051/matecconf/20141901013",
language = "English",
volume = "19",
booktitle = "MATEC Web of Conferences",
publisher = "EDP Sciences",

}

TY - GEN

T1 - Information measuring subsystem oil pumping station "parabel"

AU - Nyashina, Galina S.

AU - Glushkov, Dmitrii O.

PY - 2014/12/15

Y1 - 2014/12/15

N2 - Information-measurement subsystem oil pumping station (OPS) "Parabel", located on the site of the main pipeline "Alexandrov-Anzhero" (OJSC "AK" Transneft "". Developed on the basis of a modern microprocessor equipment, automation, as well as high-speed digital data channels. The simple solution to meet the requirements set out in the guidance document "Automation and remote control of trunk pipelines. "General provisions" (RD-35.240.0000-KTN-207-08).

AB - Information-measurement subsystem oil pumping station (OPS) "Parabel", located on the site of the main pipeline "Alexandrov-Anzhero" (OJSC "AK" Transneft "". Developed on the basis of a modern microprocessor equipment, automation, as well as high-speed digital data channels. The simple solution to meet the requirements set out in the guidance document "Automation and remote control of trunk pipelines. "General provisions" (RD-35.240.0000-KTN-207-08).

UR - http://www.scopus.com/inward/record.url?scp=84921284275&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84921284275&partnerID=8YFLogxK

U2 - 10.1051/matecconf/20141901013

DO - 10.1051/matecconf/20141901013

M3 - Conference contribution

AN - SCOPUS:84921284275

VL - 19

BT - MATEC Web of Conferences

PB - EDP Sciences

ER -