Подход к автоматизированному формированию норм времени на техническое обслуживание средств кипиа, асу тп и сооружений связи предприятий нефтегазовой отрасли

Translated title of the contribution: Approach to automated formation time norms for maintenance of control and testing instrumentation, APCs and communication equipment of oil and gas enterprises

Aleksey O. Savelev, Vladimir P. Komagorov, Sergey S. Mikhalevich

Research output: Contribution to journalArticle

Abstract

The relevance of the research is caused by the need to update and revise constantly the strategy of oil and gas enterprises economic ef: ficiency by optimizing the costs of control and testing instrumentation, APCS and communication equipment maintenance. The main aim of the research is to develop a scientifically based approach to the automated maintenance time standard of control and testing instrumentation, APCS and communication equipment. The approach should allow reducing the time and increasing the overall efficiency of the maintenance planning process. Objects of the research are technological installations of oil and gas production, preparation, pumping and storage, reservoir pressure maintenance; transport pipeline, equipment for automated process control systems; communication facilities: radio:relay and satellite communication systems, wired communication systems, fiber:optic communication lines, telephone exchanges, trunk communication systems, video surveillance and alarm systems. Methods. To automate the formation of labor standards for maintenance of new equipment, the method of classifying equipment in: to categories of technical complexity was used. Results. The authors have developed the automated calculation method for maintenance of labor cost standards. The method is based on the categories of technical complexity. The requirements for formation of software basic labor norms were determined. On the ba: sis of the proposed methodology, basic labor standards for control and testing instrumentation, APCS and communication equipment maintenance were formed (within Tomskneft company).

Translated title of the contributionApproach to automated formation time norms for maintenance of control and testing instrumentation, APCs and communication equipment of oil and gas enterprises
Original languageRussian
Pages (from-to)202-213
Number of pages12
JournalBulletin of the Tomsk Polytechnic University, Geo Assets Engineering
Volume330
Issue number2
DOIs
Publication statusPublished - 1 Jan 2019

ASJC Scopus subject areas

  • Materials Science (miscellaneous)
  • Fuel Technology
  • Geotechnical Engineering and Engineering Geology
  • Waste Management and Disposal
  • Economic Geology
  • Management, Monitoring, Policy and Law

Fingerprint Dive into the research topics of 'Approach to automated formation time norms for maintenance of control and testing instrumentation, APCs and communication equipment of oil and gas enterprises'. Together they form a unique fingerprint.

  • Cite this