Application of hybrid real-time power system simulator for setting up and close loop testing of protection and control equipment

Research output: Chapter in Book/Report/Conference proceedingConference contribution

10 Citations (Scopus)

Abstract

This paper presents new tool for setting up and comprehensive close loop testing of protection, automation and control equipment (PACE). The role of this tool for Smart Grid (SG) design process is also described. Comprehensive close loop tests of PACE in power system (PS) various regimes with consideration of possible interactions between tested equipment and other automation are possible only with the use of real-time software and hardware simulators. But digital simulators are based on numerical methods of integration and therefore impose constraints on differential order and stiffness of a mathematical model of PS. Besides, each step of differential equation integration causes the error which is accumulated and cannot be eliminated. Because of this a simulation time is very restricted and simulation itself can never be continuous. New capabilities are provided with the use of a hybrid simulation concept which has no mentioned limitations. The concept of hybrid simulation was created at Tomsk Polytechnic University and became a base for construction of Hybrid Real-Time Power System Simulator (HRTSim). HRTSim is a multipurpose tool suitable for various power engineering tasks, among which are PACE setting up and testing. Practical results of HRTSim application in the Tyumen PS are presented in this paper. HRTSim was used there for testing and setting up of momentary and sustained fast turbine valving control (FTVC) systems of the generating unit of the Surgut co-generation power plant.

Original languageEnglish
Title of host publicationProceedings - 2012 7th International Forum on Strategic Technology, IFOST 2012
DOIs
Publication statusPublished - 2012
Event2012 7th International Forum on Strategic Technology, IFOST 2012 - Tomsk, Russian Federation
Duration: 18 Sep 201221 Sep 2012

Conference

Conference2012 7th International Forum on Strategic Technology, IFOST 2012
CountryRussian Federation
CityTomsk
Period18.9.1221.9.12

Fingerprint

Control equipment
Simulators
Testing
Automation
Power system
Numerical methods
Power plants
Turbines
Differential equations
Stiffness
Mathematical models
Hardware
Control systems
Simulation

Keywords

  • control equipment
  • fast turbine valving control
  • hybrid simulation
  • protection
  • real time simulator
  • smart grid

ASJC Scopus subject areas

  • Management of Technology and Innovation

Cite this

Application of hybrid real-time power system simulator for setting up and close loop testing of protection and control equipment. / Prokhorov, A.; Borovikov, Yu; Andreev, M.

Proceedings - 2012 7th International Forum on Strategic Technology, IFOST 2012. 2012. 6357823.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Prokhorov, A, Borovikov, Y & Andreev, M 2012, Application of hybrid real-time power system simulator for setting up and close loop testing of protection and control equipment. in Proceedings - 2012 7th International Forum on Strategic Technology, IFOST 2012., 6357823, 2012 7th International Forum on Strategic Technology, IFOST 2012, Tomsk, Russian Federation, 18.9.12. https://doi.org/10.1109/IFOST.2012.6357823
@inproceedings{6902d60c6bf641d0996434ec5035c996,
title = "Application of hybrid real-time power system simulator for setting up and close loop testing of protection and control equipment",
abstract = "This paper presents new tool for setting up and comprehensive close loop testing of protection, automation and control equipment (PACE). The role of this tool for Smart Grid (SG) design process is also described. Comprehensive close loop tests of PACE in power system (PS) various regimes with consideration of possible interactions between tested equipment and other automation are possible only with the use of real-time software and hardware simulators. But digital simulators are based on numerical methods of integration and therefore impose constraints on differential order and stiffness of a mathematical model of PS. Besides, each step of differential equation integration causes the error which is accumulated and cannot be eliminated. Because of this a simulation time is very restricted and simulation itself can never be continuous. New capabilities are provided with the use of a hybrid simulation concept which has no mentioned limitations. The concept of hybrid simulation was created at Tomsk Polytechnic University and became a base for construction of Hybrid Real-Time Power System Simulator (HRTSim). HRTSim is a multipurpose tool suitable for various power engineering tasks, among which are PACE setting up and testing. Practical results of HRTSim application in the Tyumen PS are presented in this paper. HRTSim was used there for testing and setting up of momentary and sustained fast turbine valving control (FTVC) systems of the generating unit of the Surgut co-generation power plant.",
keywords = "control equipment, fast turbine valving control, hybrid simulation, protection, real time simulator, smart grid",
author = "A. Prokhorov and Yu Borovikov and M. Andreev",
year = "2012",
doi = "10.1109/IFOST.2012.6357823",
language = "English",
isbn = "9781467317702",
booktitle = "Proceedings - 2012 7th International Forum on Strategic Technology, IFOST 2012",

}

TY - GEN

T1 - Application of hybrid real-time power system simulator for setting up and close loop testing of protection and control equipment

AU - Prokhorov, A.

AU - Borovikov, Yu

AU - Andreev, M.

PY - 2012

Y1 - 2012

N2 - This paper presents new tool for setting up and comprehensive close loop testing of protection, automation and control equipment (PACE). The role of this tool for Smart Grid (SG) design process is also described. Comprehensive close loop tests of PACE in power system (PS) various regimes with consideration of possible interactions between tested equipment and other automation are possible only with the use of real-time software and hardware simulators. But digital simulators are based on numerical methods of integration and therefore impose constraints on differential order and stiffness of a mathematical model of PS. Besides, each step of differential equation integration causes the error which is accumulated and cannot be eliminated. Because of this a simulation time is very restricted and simulation itself can never be continuous. New capabilities are provided with the use of a hybrid simulation concept which has no mentioned limitations. The concept of hybrid simulation was created at Tomsk Polytechnic University and became a base for construction of Hybrid Real-Time Power System Simulator (HRTSim). HRTSim is a multipurpose tool suitable for various power engineering tasks, among which are PACE setting up and testing. Practical results of HRTSim application in the Tyumen PS are presented in this paper. HRTSim was used there for testing and setting up of momentary and sustained fast turbine valving control (FTVC) systems of the generating unit of the Surgut co-generation power plant.

AB - This paper presents new tool for setting up and comprehensive close loop testing of protection, automation and control equipment (PACE). The role of this tool for Smart Grid (SG) design process is also described. Comprehensive close loop tests of PACE in power system (PS) various regimes with consideration of possible interactions between tested equipment and other automation are possible only with the use of real-time software and hardware simulators. But digital simulators are based on numerical methods of integration and therefore impose constraints on differential order and stiffness of a mathematical model of PS. Besides, each step of differential equation integration causes the error which is accumulated and cannot be eliminated. Because of this a simulation time is very restricted and simulation itself can never be continuous. New capabilities are provided with the use of a hybrid simulation concept which has no mentioned limitations. The concept of hybrid simulation was created at Tomsk Polytechnic University and became a base for construction of Hybrid Real-Time Power System Simulator (HRTSim). HRTSim is a multipurpose tool suitable for various power engineering tasks, among which are PACE setting up and testing. Practical results of HRTSim application in the Tyumen PS are presented in this paper. HRTSim was used there for testing and setting up of momentary and sustained fast turbine valving control (FTVC) systems of the generating unit of the Surgut co-generation power plant.

KW - control equipment

KW - fast turbine valving control

KW - hybrid simulation

KW - protection

KW - real time simulator

KW - smart grid

UR - http://www.scopus.com/inward/record.url?scp=84871840565&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84871840565&partnerID=8YFLogxK

U2 - 10.1109/IFOST.2012.6357823

DO - 10.1109/IFOST.2012.6357823

M3 - Conference contribution

SN - 9781467317702

BT - Proceedings - 2012 7th International Forum on Strategic Technology, IFOST 2012

ER -